PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing rebar mats at Elev. 4-Stair -2 (3rd Floor) Facing South-West (800x600).jpg Installing rebar mats at Elev. 4-Stair 2 (3rd Floor) Facing South (800x600).jpg Installing steel columns at Derrick -3 (2nd Floor) Facing South-West (800x600).jpg Safety cables and poles at Derrick -2 (2nd Floor) Facing North (800x600).jpg Safety cables and poles at Derrick -2 (2nd Floor) Facing South (800x600).jpg Temporary Electrical panel at Elev. 1,2,3 Facing South (800x600).jpg Underground Storm sewer Facing North (800x600).jpg Excavating for the underground sanitary Sewer Facing West (800x600).jpg Installing PVC pipe for temporary power Facing North (800x600).jpg
Previous pageNext page Safety cables and poles at Derrick -2 (2nd Floor) Facing South (800x600)
Safety cables and poles at Derrick -2 (2nd Floor) Facing South (800x600)